ITE Gas Pipeline Project – Turkey

Strategic Project for the European Gas Supply of the Future

Scope

  • P/L FEED Verification, FEED for the compressor stations & Detail Engineering (DE) for entire pipelines
  • Procurement Services
  • Contracting services for construction works of pipeline and compressor stations

Technical Details

  • 7 Compressor stations with power production units
  • Onshore Pipeline – 1,750 km, dia. 56“,
    - Main Line Pipe material API 5L-X70
    - 2 Metering stations 10 Pig launchers/receivers
    - 48 line valve stations
  • Offshore Pipeline, ~ 17 km , dia. 2x36”
  • Design Capacity: 35 billion m³/year

Client

TURANG Transit Taşimacilik A.Ş, Turkey

Contract

Engineering Services for Stations & Pipelines

Jemgum Gas Storage Facilities – Germany

Fast Track Project: In 2.5 years from Study to Completion

Scope

  • Project Management
  • Conceptual, Basic, FEED & Detail Design
  • Construction Management
  • Start Up & Commissioning

Technical Details

  • Type of storage: Salt caverns
  • Drying Unit: Glycol
  • Wells / cavern: up to 12 (+12 for Phase 2)
  • Wellhead pressure: up to 207 bar g
  • Working gas: 1,200 mio. Nm³ (phase 1) 2,400 mio. Nm³ (phase 2)

Client

Wingas GmbH

Contractual scheme

EPCm Services (LS)

Viking Gas Storage Facilities – Germany

Project Execution in an International Team

Scope

  • Project Management
  • Conceptual, Basic, FEED & Detail Design
  • Construction Management
  • Start Up & Commissioning

Technical Details

  • Type of storage: High Performance Storage
  • Compressor: 3 single stage VSD driven,
  • high speed compressors trains
  • Drying Unit: Adsorption
  • Wellhead pressure: 55 to 190 barg

Client

EKB (BP / Dong / Gazprom)

Contractual scheme

EP Services

Crystal Gas Storage – Germany

State of the Art High Performance UGS

Scope

  • Project Management
  • Conceptual, Basic, FEED & Detail Design
  • Construction Management
  • Start Up & Commissioning

Technical Details

  • Type of storage: Salt caverns
  • Drying Unit: Glycol
  • Compressor: 2 x VSD driven high speed motor (+ 2 Options) / (10,7 MW) with tandem compressor
  • Wells / cavern: 4 (phase 1) / 8 (phase 2)
  • Wellhead pressure: 55 to 190 barg
  • Working gas: 1,400 mio. Nm³ (phase 1)/2,800 mio. Nm³ (phase 2)

Client

Crystal (EDF, EnBW)

Contractual scheme

EPCm Services (LS)

Crude Oil Supply Pipeline – Northern Iraq

Basic FEED Package incl. route selection with tight execution schedule

Scope

Conceptual Design & Basic FEED:

  • Route selection and optimization
  • Hydraulic simulation
  • Designing of pipeline system for throughput of 120TBBLCD
  • Design of Pump stations Taq Taq & Bina Bawi

Technical Details

  • Type :Crude Oil Pipeline System
  • Medium: Crude Oil, API Gravity 48.27/41.91
  • Diameter / Length:18’’ / 120 km
  • Pump station Taq Taq :1st Phase: 55.000 bpd
  • Pump station Bina Bawi: 2nd Phase; 45.000 bpd + Raw water pipeline incl.
  • pumping station 500m³/h

Client

Qaiwan Group, Iraq

Contractual scheme

Services (LS)

Water Transmission System – Phase 1&2

Fujairah - Securing 40% of the Water Supply of the UAE

Scope

  • Project Management
  • Engineering, Procurement, Construction
  • Start Up & Commissioning

Technical Details

Type: Water Transmission System

Pipeline system

  • System Capacity: 230 MIGD
  • 2 x 180 km; 64’’, X42-X70; MOP 56 barg, 18.900m³/h (Phase 1)
  • 130km, 64”, X65-X42 (Phase 2)
  • Branch Lines 24’’, Loop Line incl. Block Valve Stations

Qidfa Pumping Station

  • 4+5 booster pumps (1.4 MW each)
  • 4+5 main pumps (11 MW each)
  • 24 x surge vessels (122m³ each)
  • 5 MIG Tanks

Client

Transco / UOG

Contractual scheme

EPC - LSTK

Completion

2 Phases

NEB – North East BAB - Phase 1 – UAE

Field Development in a sensitive environmental area

Scope

  • Project Management
  • Engineering, Procurement, Construction
  • Start Up & Commissioning

Technical Details

Type
  • Oil Production Infield & Export Lines
  • Oil Production from two Fields, AlDabb‘iya (Off & Onshore) Shallow Water / Sabkhat and Rumaitha Desert Area
Others
  • Electrical works along the Pipe Route
  • Central processing plant at Al-Dabbiya
  • Central processing plant at Rumaitha
  • 15 Clusters (remote stations) at Al-Dabbiya
  • 10 Clusters at Rumaitha / Shanayel

Capacity of CPP:

110.000 bpd

Pipelines

~530 km ; 3”-20”; Off-/ Onshore

Client

ADCO, UAE

Contractual scheme

EPC - LSTK